• Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
tiktok
facebook
linkedin
rss
youtube
google_plus
email
Unido Digital Media, LLC
  • BFSI
  • Energy
  • Infocom
  • Mining
  • Venture
  • Industry
  • Travel
  • Civic
  • Food, Health, Ag
  • Real Estate
  • ESG
  • Economy
  • Law & Justice
  • Interview
  • Analysis
  • Events
A man in a Collective Mining vest examines a rock sample with a hand lens while two others look on

Collective Mining Maps Out Separate Copper and Tungsten Circuits for Apollo Ahead of 2027 License Filing

Posted On September 28, 2026
By : Loren Moss
Comment: 0
Tag: ALS Canada, antioquia, APC-162, apollo deposit, ari sussman, aris mining, british columbia, buriticá, caldas, Canadian Institute of Mining Metallurgy and Petroleum, CIM Definition Standards, cnl, collective mining, colombia, colombia mining, continental gold, copper, copper concentrate, cyanidation, doré, environmental license, Feasibility Study, flotation, flowsheet, gold, gold equivalent, gravity concentration, Guayabales Project, Kamloops, locked-cycle testing, marmato, Marmato Mine, metallurgical testing, mineral resource estimate, National Instrument 43-101, Ned Jalil, omar ossma, open pit, Preliminary Economic Assessment, scheelite, silver, Standards Council of Canada, supia, tungsten, WO3, zijin mining group

Copper Sub-domain Test Shows 95% Copper and 94.4% Silver Recovery

Collective Mining Ltd. (Nasdaq: CNL; TSX: CNL) is advancing a two-route processing flowsheet for the Apollo deposit at its Guayabales Project in Caldas, Colombia. Most of the material would go through a conventional gravity and cyanidation plant producing gold-silver doré. Copper-rich and tungsten-rich material from two defined sub-domains would be routed to separate flotation circuits producing their own concentrates. The company outlined the design in a September 21, 2026, release that also reported new Copper Sub-Domain test results and head grades for the Tungsten Sub-Domain samples. Collective is working toward an environmental license application in the second half of 2027.

The flowsheet follows the company’s maiden Mineral Resource, published September 8, 2026. That estimate put Apollo at 37.0 million tons Indicated grading 2.17 grams per ton (g/t) gold equivalent (AuEq), or 2.58 million ounces AuEq, plus 48.2 million tons Inferred at 1.83 g/t AuEq, or 2.83 million ounces AuEq. The new work addresses how gold, silver, copper and tungsten would be recovered from different parts of the deposit.

Why Two Routes

According to the company, the broader deposit is predominantly gold and silver with low copper and tungsten grades, while higher-grade copper and tungsten mineralization is concentrated in two defined sub-domains. Outside the Copper Sub-Domain, copper averages 0.04% in the Indicated portion of the Mineral Resource and 0.02% in the Inferred portion. Material with low copper and low tungsten grades would go through gravity recovery and cyanidation to produce doré.

The Copper Sub-Domain holds 10.2 million tons of Indicated material grading 0.41% copper, 1.25 g/t gold, 56.0 g/t silver and 0.022% tungsten trioxide (WO3), or about 27.6% of total Indicated tonnage. It also contains 0.81 million tons of Inferred material at 0.37% copper, 1.7% of the Inferred category. Higher-grade Copper Sub-Domain material would feed a copper flotation circuit making a concentrate with gold and silver credits. The flotation tailings would then be sent to cyanidation to recover the remaining gold and silver.

The Tungsten Sub-Domain is much smaller. It holds 2.57 million tons Indicated grading 0.10% WO3, 1.38 g/t gold, 39.1 g/t silver and 0.39% copper, or 6.9% of Indicated tonnage, plus 0.05 million tons Inferred at 0.20% WO3. A front-end gravity stage would separate tungsten-rich material for treatment in what the company calls a “small, dedicated” circuit using gravity concentration and flotation. Gold, silver and copper in that material would be separated and directed to the main processing circuit.

The two sub-domains are not mutually exclusive and may overlap, and Collective says their tonnages should not be added to each other or to the overall Mineral Resource because doing so could double-count material. The company describes both as subsets of the open-pit Mineral Resource and says it expects copper and tungsten production to come mainly from them.

Cross-section of the Apollo open pit outline with copper grades shaded inside the Copper Sub-Domain

Cross-section of the Apollo Mineral Resource open pit showing the higher-grade Copper Sub-Domain. (Figure courtesy Collective Mining)

The Test Results

All metallurgical samples were prepared and analyzed at the Kamloops, British Columbia, laboratory of ALS Canada Ltd. Composites came from the remaining half drill core of 32 Apollo holes. According to the company, ALS Canada conforms to ISO/IEC 17025, and the Kamloops laboratory is accredited by the Standards Council of Canada for the specific tests in the program.

Material / test stage Head grades Results Source release
Apollo master composite / locked-cycle testing 1.4 g/t Au, 20 g/t Ag, 0.08% Cu 95% gold, 92% silver and 85% copper recovery; cyanide consumption of 0.57 kilograms per ton Recoveries: August 25, 2026; cyanide figure: September 21, 2026
Copper Sub-Domain composite / open-circuit testing 1.16 g/t Au, 71 g/t Ag, 0.42% Cu 95% copper, 90% gold and 94.4% silver recovery via gravity, flotation and cyanidation; concentrate grading 27.2% Cu, 37.6 g/t Au and 3,504 g/t Ag September 21, 2026
Tungsten Sub-Domain test work 2.91 g/t Au, 26.4 g/t Ag, 0.15% Cu, 0.44% WO3 Up to 74% tungsten recovery via gravity and flotation; separate bulk-sample testing produced a concentrate containing 95% scheelite Recovery and scheelite results: August 25, 2026; Tungsten Sub-Domain head grades: September 21, 2026

The master composite results were first reported on August 25, 2026. That composite was built from drill core taken across roughly the top 1,000 meters of the deposit. The copper composite and the tungsten test samples were sourced specifically from their respective sub-domains. Earlier gold recovery work on the Apollo system, done before the deposit had a formal resource estimate, was covered by Finance Colombia.

The resource estimate’s gold-equivalent calculation assumes recoveries of 95% for gold, 92% for silver, 85% for copper and 70% for WO3. The Copper Sub-Domain figures come from open-circuit testing. Locked-cycle testing of that material is the next step in the company’s metallurgical program.

“The higher-grade copper and tungsten sub-domains which are contained mostly within the Open Pit portion of the mineral resource will be selectively routed through dedicated flotation concentrate circuits designed to recover those metals.”

— Ned Jalil, chief executive officer, Collective Mining

Chief Executive Officer Ned Jalil, who approved the release’s technical information as a Qualified Person under Canada’s National Instrument 43-101, said the majority of the Mineral Resource “will be processed through a conventional cyanidation circuit with low reagent consumption to produce gold and silver doré.” He added: “The test work completed to date strongly supports this approach, and we are now optimizing the integrated flowsheet as we advance toward our planned 2027 licensing submission in Colombia.” Collective named Jalil chief executive in April 2025, with Omar Ossma remaining president.

What Comes Next

The next phase of metallurgical work will include locked-cycle testing of higher-grade Copper Sub-Domain material, variability testing and optimization of the tungsten circuit. The goal is to confirm circuit configuration, recoveries, reagent requirements and concentrate specifications. Collective says the final flowsheet design and performance parameters depend on completing the metallurgical and engineering programs.

Collective laid out the following milestones, among others, with the resource estimate:

  • construction of an underground exploration adit starting in the fourth quarter of 2026
  • an environmental license application in the second half of 2027
  • an updated resource estimate in the first quarter of 2028
  • a Preliminary Economic Assessment and an expected license decision in the second half of 2028
  • a Feasibility Study by mid-2029
  • the start of early works and construction in the second half of 2029

Executive Chairman Ari Sussman said at the time that the company was accelerating environmental baseline, engineering and permitting studies alongside exploration. In the same release, he stated: “Our priority is to grow the resource and establish the technical and environmental basis for development, subject to study results, financing and the required approvals.”

Collective says it has drilled more than 42,000 meters at Apollo since the March 31, 2026, database cut-off used for the maiden estimate, and none of that drilling is included in the current Mineral Resource. The September 8 release lists hole APC-162, announced on June 29, 2026, among selected drill results not included in the Mineral Resource. APC-162 returned 27.35 meters grading 1.68% WO3, 11.62 g/t gold, 54 g/t silver and 0.43% copper from 336.40 meters downhole, which the company expresses as 2.51% WO3 equivalent. Finance Colombia reported the intercept at the time. The company’s tungsten cross-section places the intercept below the modeled Tungsten Sub-Domain and labels it “Not included in MR.”

Cross-section of the Apollo open pit with tungsten grades shaded and drill hole APC-162 marked below them

Cross-section of the Apollo Mineral Resource open pit showing the higher-grade Tungsten Sub-Domain and the APC-162 intercept, which is not included in the Mineral Resource. (Figure courtesy Collective Mining)

Resource Context and Caveats

The Indicated Mineral Resource contains 1.64 million ounces of gold, 29.0 million ounces of silver, 115 million pounds of copper and 3,887 tons of WO3. The Inferred Mineral Resource adds 2.47 million ounces of gold, 13.0 million ounces of silver, 32 million pounds of copper and 1,081 tons of WO3. The gold-equivalent calculation assumes gold at $3,000 USD per ounce, silver at $60 USD per ounce, copper at $5.25 USD per pound and WO3 at $93.31 USD per pound.

The estimate is classified under the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards. The company notes that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability, and that the conceptual pit shell and underground shapes used to constrain the estimate are not engineered mine designs or an economic study.

Location and Background

The Apollo deposit lies about 1.75 kilometers northwest of the Marmato mine operated by Aris Mining (NYSE: ARIS; TSX: ARIS). Collective has secured additional mining titles at the project following public hearings in Supía and Marmato. According to the company, its founding team previously developed Continental Gold, which Sussman says discovered the Buriticá deposit in Antioquia. Zijin Mining Group (SSE: 601899; HKEX: 2899) agreed to acquire Continental Gold in a transaction announced December 2, 2019, with a total equity value of approximately $1.4 billion CAD on a fully diluted basis.

Headline photo: A Collective Mining team member examines a rock sample with a hand lens as two others look on. (Photo courtesy Collective Mining)

DON'T MISS OUT: The only English-language Colombia news that's strictly business, markets, & investment!
Join global executives & investors by subscribing to our FREE weekly updates
Thank you for subscribing.
Something went wrong.
I agree to have my personal information transferred to MailChimp ( more information ) DISCLAIMER: Protección de Datos Personales Artículo 15 de la Constitución Política de Colombia, ley 1581 de 2012 y decreto 1377 de 2013.
We will never spam you or share your email address ¡Nunca Jamás!

Follow us on Youtube, Podcast & Social Media !!

Website | Subscribe
Video: YouTube Channel | YouTube Posts | YouTube Shorts
Podcasts: Apple | Audible | iHeart | Spotify | Podcast Addict | Spreaker | Deezer | Castbox | Podchaser
Social: Facebook | LinkedIn | Instagram
About the Author
Loren Moss is the founder and publisher of Finance Colombia. He has over 20 years of international business experience, including over a decade of experience in securities, insurance, and commercial real estate, at the institutional and international level.
  • google-share
Previous Story

Outcrop Silver’s Structural Model Confirms New High-Grade Shoot at Santa Ana

Related Posts

A speaker at a podium addresses an audience under a thatched open-air pavilion in Quimbaya, Quindío
0

Colombia Commits More Than $3 Billion COP to Quindío’s Earthquake-Hit Tourism Sector

Posted On September 28, 2026
, By Loren Moss
Water and mist pour through the spillway of the Hidroituango hydroelectric dam, with a rainbow in the spray
0

EPM Secures $348.69 Million USD From France’s AFD in Third Credit Deal

Posted On September 28, 2026
, By Loren Moss
Open sacks of corn, red beans, rice and other grains viewed from above at a market
0

Colombia’s Inflation Accelerates to 6.24% in August as Bancolombia Sees Rates Holding at 12%

Posted On September 22, 2026
, By Loren Moss

Search Finance Colombia

Add FinanceColombia as a preferred source on Google

Watch this!

https://youtu.be/lIc5NnmSb94?si=IUOMJr7z8ZosHxsS

Listen to our Podcast

Follow us on Youtube, Podcast & Social Media !!

Website | Subscribe
Video: YouTube Channel | YouTube Posts | YouTube Shorts
Podcasts: Apple | Audible | iHeart | Spotify | Podcast Addict | Spreaker | Deezer | Castbox | Podchaser
Social: Facebook | LinkedIn | Instagram

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








Search

RSS feed: Bilingual & Remote Jobs Bilingual & Remote Jobs

  • Agenda Manager - Do you want to break into international business but nobody will give you a chance? - Remote
  • Sales Associate - Kingston, Jamaica
  • Asset Manager - Madrid, Spain
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Técnico/a de Calibración Junior - Barcelona, Spain
  • Digital Analyst - Barcelona, Spain
  • Analista Seguimiento Refacciones
  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • ADAS Test Driver - Mexico City, CDMX, Mexico
  • Desarrollador fullstack - Bogotá, Bogota, Colombia

Categories

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








RSS feed: Empleobilingue.com Empleobilingue.com

  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Desarrollador fullstack - Bogotá, Bogota, Colombia
  • Technical Analyst - Remote
  • PIM Administrator - Ecommerce - Remote (Bogotá, Bogota, Colombia)
  • Auxiliar de gestión humana y bienestar para Girardota 1626060072.28 - Girardota, Antioquia, Colombia
  • Marketing Strategist
  • Trainer Manager - Bogotá, Bogota, Colombia
  • Tolemaida UH- 60 Inspector - Bogotá, Bogota, Colombia
  • Virtual Assistant - Team Lead - Remote

Contact Us

  • Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
Copyright 2014-2023 Finance Colombia All Rights Reserved. We may earn commissions from qualifying purchases.
WhatsApp us