• Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
facebook
linkedin
email
Unido Digital Media, LLC
  • BFSI
  • Energy
  • Infocom
  • Mining
  • Venture
  • Industry
  • Travel
  • Civic
  • Food, Health, Ag
  • Real Estate
  • ESG
  • Economy
  • Law & Justice
  • Interview
  • Analysis
  • Events
Aruchara-4 Drilling Rig.

NG Energy Announces Progress at Its Colombian Caribbean Petroleum Projects

Posted On August 17, 2025
By : Editorial Staff
Comment: Off
Tag: aruchara, Aruchara-3 well, Aruchara-4 well, Aruchara-5 well, Central Processing Facility, colombia, Córdoba, gasx, gasxf, INFRAES, Jimol formation, la guajira, Maria Conchita, Maria Conchita Block, NG Energy International Corp, otcqx: gasxf, sin, Sinu-9 block, tsxv: gasx

NG Energy International Corp. (TSXV: GASX) (OTCQX: GASXF) has announced the commencement of drilling at the Aruchara-4 well at the Maria Conchita block in La Guajira, Colombia, and an increase in production at the Sinu-9 block in Córdoba, Colombia.

At the Maria Conchita block, the Aruchara-4 well is being drilled to a total depth of 10,000 feet. The well targets the Jimol formation and aims to develop the H1A and H1B accumulations. The company will also explore the potential for reserve and resource extension in the H2 AA section and H3 and H4 fractures, and test the limestone formation on top of the well’s basement. The well is expected to be completed and tied in by the end of September 2025.

After the drilling of Aruchara-4, the rig will be used for a workover and recompletion of the Aruchara-3 well to address a downhole mechanical obstruction. The company will then proceed with the drilling of the Aruchara-5 well.

At the Sinu-9 block, gross production has reached 22 million cubic feet per day (MMcf/d). The company is completing the installation of dew point handling equipment at the Central Processing Facility, with full installation expected by the end of August. Once the equipment is installed, aggregate gross production at Sinu-9 is projected to increase to up to 30 MMcf/d.

The company is also working with its infrastructure partner, INFRAES, on the construction of a twin pipeline to double transportation capacity from Sinu-9. The project is being completed in two phases. The first phase, an 18-kilometer loop from Jobo, is expected to increase transportation capacity to 40 – 45 MMcf/d. The second phase, the full twin pipeline, is expected to be completed in the first quarter of 2026 and will increase transportation capacity to 60 MMcf/d.

Aruchara-4 Drilling Rig. Photo credit: CNW Group/NG Energy International Corp.

DON'T MISS OUT: The only English-language Colombia news that's strictly business, markets, & investment!
Join global executives & investors by subscribing to our FREE weekly updates
Thank you for subscribing.
Something went wrong.
I agree to have my personal information transferred to MailChimp ( more information ) DISCLAIMER: Protección de Datos Personales Artículo 15 de la Constitución Política de Colombia, ley 1581 de 2012 y decreto 1377 de 2013.
We will never spam you or share your email address ¡Nunca Jamás!
About the Author
Finance Colombia is the only English-language publication dedicated to Colombia’s economy, business world, and financial sector.
  • google-share
Previous Story

EPM Seeks Additional Hydroelectric Energy Development Partners

Next Story

EPM Exploring Green Hydrogen Production in Colombia’s Urabá Region

Related Posts

0

Indicted Ex-Foreign Minister Calls Colombian President Gustavo Petro “Mafia Boss”

Posted On April 10, 2026
, By Loren Moss
0

Tecnoglass Cuts 2026 EBITDA Guidance as US Aluminum Tariffs Hit Colombian Window Exports

Posted On April 10, 2026
, By Loren Moss
The US Jazz Faculty Collective Viernes 24 de abril | 7:00 p.m. | Teatro El Tesoro
0

Experience the Pinnacle of Jazz as US Faculty Masters Perform in Medellín April 24th

Posted On April 10, 2026
, By Loren Moss

Search Finance Colombia

Watch this!

https://youtu.be/lIc5NnmSb94?si=IUOMJr7z8ZosHxsS

Listen to our Podcast

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








Search

RSS Bilingual & Remote Jobs

  • Agenda Manager - Do you want to break into international business but nobody will give you a chance? - Remote
  • Sales Associate - Kingston, Jamaica
  • Asset Manager - Madrid, Spain
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Técnico/a de Calibración Junior - Barcelona, Spain
  • Digital Analyst - Barcelona, Spain
  • Analista Seguimiento Refacciones
  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • ADAS Test Driver - Mexico City, CDMX, Mexico
  • Desarrollador fullstack - Bogotá, Bogota, Colombia

Categories

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








RSS Empleobilingue.com

  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Desarrollador fullstack - Bogotá, Bogota, Colombia
  • Technical Analyst - Remote
  • PIM Administrator - Ecommerce - Remote (Bogotá, Bogota, Colombia)
  • Auxiliar de gestión humana y bienestar para Girardota 1626060072.28 - Girardota, Antioquia, Colombia
  • Marketing Strategist
  • Trainer Manager - Bogotá, Bogota, Colombia
  • Tolemaida UH- 60 Inspector - Bogotá, Bogota, Colombia
  • Virtual Assistant - Team Lead - Remote

Contact Us

  • Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
Copyright 2014-2023 Finance Colombia All Rights Reserved. We may earn commissions from qualifying purchases.
WhatsApp us