• Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
facebook
linkedin
email
Unido Digital Media, LLC
  • BFSI
  • Energy
  • Infocom
  • Mining
  • Venture
  • Industry
  • Travel
  • Civic
  • Food, Health, Ag
  • Real Estate
  • ESG
  • Economy
  • Law & Justice
  • Interview
  • Analysis
  • Events
Collective Mining site. Photo: Loren Moss

Collective Mining Mobilizes Sixth Rig to Guayabales Project and Announces Upcoming Geophysical Survey

Posted On June 24, 2024
By : Editorial Staff
Comment: Off
Tag: ari sussman, caldas, canada, collective mining, Geotech Ltd, gold, Guayabales Project, toronto, TSX: CNL

Collective Mining Ltd. (TSX: CNL), a Canada-based mining company, recently announced that it has mobilized a sixth drill rig to its Guayabales Project in Caldas to contribute to the 40,000-meter drill program at the site for 2024.

This adds to the drill rigs that are currently operating at the Apollo, Box, Olympus and Trap targets, “with the sixth rig to commence drilling for the first time at the grassroot generated X target located in the southern portion of the project area,” according to the Toronto-based company.  “Drill cores from multiple holes are currently being assayed at ALS Laboratory in Lima, Peru, with results expected in short order.”

Collective Mining noted that it will also soon begin an airborne geophysical survey covering the company’s Guayabales Project in Caldas.

“The primary objective of the program is to detect conductive sulphide bearing ore bodies, similar to the Apollo system, at depths beginning directly below the surficial cover to up to 2,000 metres depth,” noted Collective Mining.

This survey will be conducted by Geotech Ltd., which will carry out helicopter borne Versatile Time-domain Electromagnetic (VTEM) and Z-Axis Tipper Electromagnetic system (ZTEM) surveys, and cover a total area of 74 square kilometers with 1,449 flight line kilometers.

The company expects the surveys to be completed in July 2024, with full results ready by the end of the third quarter. Depending on the outcome, drilling on new targets generated from the survey could begin as soon as the fourth quarter of this year, noted Collective Mining.

“The enormous potential of our Guayabales Project has already been proven based on the number of discoveries that we have made by drilling within the confines of areas defined by limited outcrop exposure,” said Ari Sussman, executive chairman, in a statement.

“Since over 90% of the project remains under cover,” added Sussman, “commissioning an airborne VTEM and ZTEM survey makes a lot of sense to assist us in outlining new targets in areas with no outcrop. In particular, we are excited to use the results to refine planned future drilling at the Plutus target given its sheer scale and lack of outcropping rock to sample.”

Photo: One of Collective Mining’s sites in Colombia. (Photo credit: Loren Moss)

[optinform]

About the Author
Finance Colombia is the only English-language publication dedicated to Colombia’s economy, business world, and financial sector.
  • google-share
Previous Story

Collective Mining Expands its Box Target Area with New High-Grade Samples; Drilling Continues

Next Story

Interview: Glencore’s Cerrejón Director Makes the Case for the Coal Mine’s ESG Efforts in Colombia

Related Posts

The Higabra Valley Tunnel at Continental Gold's Buriticá goldmine in Antioquia.
0

Aris Mining Completes Underground Connection at Marmato Gold Mine

Posted On April 19, 2026
, By Loren Moss
gold zonte metals gran colombia gold eco oro mineral corp
off

Aris Mining Posts 36% Year-Over-Year Gold Production Increase at Colombia Operations in Q1 2026

Posted On April 9, 2026
, By Loren Moss
Photo courtesy Frontera Energy Corporation.
off

Frontera Energy Reports Loss While Pursuing Divestiture of Exploration & Production Assets

Posted On March 23, 2026
, By Loren Moss

Search Finance Colombia

Watch this!

https://youtu.be/lIc5NnmSb94?si=IUOMJr7z8ZosHxsS

Listen to our Podcast

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








Search

RSS Bilingual & Remote Jobs

  • Agenda Manager - Do you want to break into international business but nobody will give you a chance? - Remote
  • Sales Associate - Kingston, Jamaica
  • Asset Manager - Madrid, Spain
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Técnico/a de Calibración Junior - Barcelona, Spain
  • Digital Analyst - Barcelona, Spain
  • Analista Seguimiento Refacciones
  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • ADAS Test Driver - Mexico City, CDMX, Mexico
  • Desarrollador fullstack - Bogotá, Bogota, Colombia

Categories

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








RSS Empleobilingue.com

  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Desarrollador fullstack - Bogotá, Bogota, Colombia
  • Technical Analyst - Remote
  • PIM Administrator - Ecommerce - Remote (Bogotá, Bogota, Colombia)
  • Auxiliar de gestión humana y bienestar para Girardota 1626060072.28 - Girardota, Antioquia, Colombia
  • Marketing Strategist
  • Trainer Manager - Bogotá, Bogota, Colombia
  • Tolemaida UH- 60 Inspector - Bogotá, Bogota, Colombia
  • Virtual Assistant - Team Lead - Remote

Contact Us

  • Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
Copyright 2014-2023 Finance Colombia All Rights Reserved. We may earn commissions from qualifying purchases.
WhatsApp us