• Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
facebook
linkedin
email
Unido Digital Media, LLC
  • BFSI
  • Energy
  • Infocom
  • Mining
  • Venture
  • Industry
  • Travel
  • Civic
  • Food, Health, Ag
  • Real Estate
  • ESG
  • Economy
  • Law & Justice
  • Interview
  • Analysis
  • Events

Aris Mining Posts 36% Year-Over-Year Gold Production Increase at Colombia Operations in Q1 2026

Posted On April 9, 2026
By : Loren Moss
Comment: 0
Tag: antioquia, aris, aris mining, Aris Mining Corporation, caldas, canada, carbon-in-pulp, CIP plant, colombia, gold, guyana, latin america, Lillian Chow, marmato, neil woodyer, new york stock exchange, nyse, Oliver Dachsel, Pamela De Mark, prefeasibility study, Q1 2026, santander, SEC, sedar, segovia, Soto Norte, south america, toronto stock exchange, toroparu, tsx, underground mining, vancouver

Higher grades at Segovia drive output and revenue gains

Vancouver-based Aris Mining Corporation (TSX: ARIS; NYSE: ARIS) reported preliminary first-quarter 2026 gold production of 74,300 ounces from its two underground mines in Colombia, representing a 6% increase over the fourth quarter of 2025 and a 36% increase compared to the same period a year earlier.

The company said it sold 74,800 ounces of gold during the quarter at an average realized price exceeding $4,860 USD per ounce, generating gold revenue of more than $360 million USD. That figure marks a 20% increase from Q4 2025 revenue of $301 million USD and more than double the $154 million USD reported in Q1 2025. The company reported a cash balance exceeding $470 million USD as of March 31, 2026, an increase of approximately $80 million USD from the end of the previous quarter.

“We expect Q1 2026 gold revenue to exceed $360 million, a significant increase from $154 million in Q1 2025 and $301 million in Q4 2025, driven by higher gold prices and increased ounces sold.” — Neil Woodyer, Chair and CEO, Aris Mining Corporation

The production gains were concentrated at Aris Mining’s Segovia operation in the department of Antioquia, which produced 66,600 ounces during the quarter, up from 63,100 ounces in Q4 2025 and 47,500 ounces in Q1 2025. The year-over-year increase of 40% at Segovia was driven primarily by a notable improvement in ore grade. The average gold grade processed rose to 12.41 grams per ton from 9.37 grams per ton a year earlier, a 32% increase, while the volume of ore processed increased 5% to 175,000 tons. Recovery rates held at 95.3%, compared to 96.1% in both the prior quarter and Q1 2025.

The higher grades offset a decline in throughput compared to Q4 2025, when the mine processed 201,000 tons at an average grade of 10.10 grams per ton. Aris Mining completed installation of a second mill at Segovia in June 2025, increasing processing capacity by 50% to 3,000 tons per day, and the company has indicated that the ramp-up at the operation is continuing.

At the Marmato mine in the department of Caldas, production totaled 7,800 ounces in Q1 2026, an increase from 6,700 ounces in Q4 2025 and 7,200 ounces in Q1 2025. Marmato processed 77,000 tons of ore at an average grade of 3.53 grams per ton during the quarter, compared to 75,000 tons at 3.12 grams per ton in Q4 2025. Recovery rates at Marmato declined slightly to 89.6% from 90.8% in the prior quarter.

Consolidated Production Summary

Gold production and sales Q1 2026 Q4 2025 Q1 2025
Segovia (koz) 66.6 63.1 47.5
Marmato (koz) 7.8 6.7 7.2
Total production (koz) 74.3 69.9 54.8
Total sales (koz) 74.8 71.7 54.3

Growth Outlook

Neil Woodyer, the company’s chair and CEO, said production growth in 2026 is expected to be weighted toward the second half of the year. The company is building a new bulk mine and carbon-in-pulp (CIP) processing plant at Marmato, with first gold expected in Q4 2026. At steady state, the expanded Marmato operation is expected to produce approximately 200,000 ounces per year.

Together, the Segovia and Marmato expansions are expected to increase Aris Mining’s annual gold production to approximately 500,000 ounces. The two mines produced a combined 257,000 ounces in 2025.

Beyond its operating mines, Aris Mining is advancing the Soto Norte gold project in the department of Santander, Colombia, where environmental studies are being finalized for submission in Q2 2026 to initiate the licensing process. The company also holds the Toroparu gold project in Guyana, where a prefeasibility study is underway and a construction decision is expected in early 2027. These projects form part of Aris Mining’s longer-term objective of reaching approximately 1 million ounces of annual gold production, though that target includes estimates from a preliminary economic assessment for Toroparu that the company has cautioned are based on inferred mineral resources and are speculative in nature.

The company expects to report full Q1 2026 financial and operating results on or about May 6, 2026. The quarterly results contained in the April 7 announcement are preliminary and may differ from final figures.

Aris Mining is listed on the Toronto Stock Exchange and the New York Stock Exchange under the ticker symbol ARIS. Company filings are available through SEDAR+ and the US Securities and Exchange Commission.

DON'T MISS OUT: The only English-language Colombia news that's strictly business, markets, & investment!
Join global executives & investors by subscribing to our FREE weekly updates
Thank you for subscribing.
Something went wrong.
I agree to have my personal information transferred to MailChimp ( more information ) DISCLAIMER: Protección de Datos Personales Artículo 15 de la Constitución Política de Colombia, ley 1581 de 2012 y decreto 1377 de 2013.
We will never spam you or share your email address ¡Nunca Jamás!
About the Author
Loren Moss is the founder and publisher of Finance Colombia. He has over 20 years of international business experience, including over a decade of experience in securities, insurance, and commercial real estate, at the institutional and international level.
  • google-share
Previous Story

Jaguar Uranium Initiates Rare Earth Element Assessment at Colombia’s Berlin Mining Project

Related Posts

Housing construction costs rose by 4.77% in Colombia in 2017. (Credit: Jared Wade)
0

Bancolombia NowCast Index Signals Colombia Economic Slowdown in First Quarter

Posted On April 8, 2026
, By Loren Moss
0

S&P Global Ratings Downgrades Colombia to BB- Amid Fiscal Concerns

Posted On April 8, 2026
, By Loren Moss
Headline photo of Medellín's Comuna 13 (photo © Loren Moss)
0

History Channel Premieres Documentary Highlighting Medellin Social Intervention Program

Posted On April 6, 2026
, By Loren Moss

Search Finance Colombia

Watch this!

https://youtu.be/lIc5NnmSb94?si=IUOMJr7z8ZosHxsS

Listen to our Podcast

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








Search

RSS Bilingual & Remote Jobs

  • Agenda Manager - Do you want to break into international business but nobody will give you a chance? - Remote
  • Sales Associate - Kingston, Jamaica
  • Asset Manager - Madrid, Spain
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Técnico/a de Calibración Junior - Barcelona, Spain
  • Digital Analyst - Barcelona, Spain
  • Analista Seguimiento Refacciones
  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • ADAS Test Driver - Mexico City, CDMX, Mexico
  • Desarrollador fullstack - Bogotá, Bogota, Colombia

Categories

Sign up for the Finance Colombia Newsletter

We promise to never share your email address!
don't forget to include "https://"
* = required field
Your Background / Function








RSS Empleobilingue.com

  • Director/a de operaciones para hotel, restaurante y discoteca 1626320364.60 - Medellín, Medellin, Antioquia, Colombia
  • Coordinador/a de calidad para La Unión 1626483143.1 - La Unión, Antioquia, Colombia
  • Desarrollador fullstack - Bogotá, Bogota, Colombia
  • Technical Analyst - Remote
  • PIM Administrator - Ecommerce - Remote (Bogotá, Bogota, Colombia)
  • Auxiliar de gestión humana y bienestar para Girardota 1626060072.28 - Girardota, Antioquia, Colombia
  • Marketing Strategist
  • Trainer Manager - Bogotá, Bogota, Colombia
  • Tolemaida UH- 60 Inspector - Bogotá, Bogota, Colombia
  • Virtual Assistant - Team Lead - Remote

Contact Us

  • Subscribe Now
  • Contact Us
  • Privacy Policy
  • About Us
Copyright 2014-2023 Finance Colombia All Rights Reserved. We may earn commissions from qualifying purchases.
WhatsApp us